Short description of the project:
Client: AD ESM Skopje, subsidiary of REK Bitola
Location: Suvodol (REK) – Novaci municipality
Preparation of the revised basic and infrastructure project together with the rehabilitation of the Suvodol dam pipeline to TZ, the connecting shaft for PE Rudnik to the entrance shaft in PE Rudnik and from TZ to the entrance to the thermal power plant HPV connecting shaft with replacement of pipes and fittings.