
Reconstruction of linear infrastructure construction on “8 Septemvri” street, including:
-Reconstruction with additional roadway L=840.00m.
-Construction of storm sewer.
-Reconstruction with dislocation of mixed sewerage on part of the street L=732.30m.
-Production of house connections to mixed sewerage L=87.87m.
-Reconstruction with dislocation and construction of water supply network on part of “8 Septemvri” street.
-Construction of street lighting on part of “8 Septemvri” street in Bitola.
🔵Bv Engineering – Construction is our challenge!